Südwolle Group Italy — Bulsafil

2026

Q1 · 2026

Reducing production batch changeover time

Goal: Reduce batch changeover time on the first machine group of line C through standardization and workplace organization.

Main result: Batch changeover time fell by 62%; the 5S score rose from 52 to 80 points.

Q2 · 2026

Q2 2026 – Improvement Project

Goal: Reduce batch changeover time in Preparation Department B through better cleaning, reloading and adjustment.

Main result: Batch changeover time fell from 41 min 55 s to 23 min 17 s, an improvement of 45%.

Q3 · 2026

Q3 2026 – Improvement Project

Goal: Reduce batch changeover time on the third machine group in Preparation Workshop B.

Main result: Batch changeover time fell from 26 min 31 s to 17 min 49 s, a reduction of 33%.